Pages

Showing posts with label sock knitting. Show all posts
Showing posts with label sock knitting. Show all posts

Sunday, January 20

KAL Notice

Tomorrow I will be uploading the first part of the pattern for Eggplant Parmigiana. http://www.ravelry.com/patterns/library/eggplant-parmigiana That means that the price to join the KAL will be going up to the regular price of $4.99. Last chance to join in at the sale price!

Wednesday, January 9

Eggplant Parmigiana now available!!

I'll have more details later for y'all, but I wanted to quickly announce that the KAL pattern for Eggplant Parmigiana is now available.

The pattern page is here: Eggplant Parmigiana
My Ravelry group where the KAL is being hosted is here: Nicole Rodgers Designs

The pattern is currently being offered at the low introductory price of $1.99 until January 21st, 2013. That is when the next "clue" is being released and the price will be the regular price of $4.99.

Friday, September 14

(U)FO Friday...

Well today's FO isn't my UFO. I was hoping to have the basket weave afghan finished by tonight, but it just wasn't in the cards. I can *partially* blame it on knit night last night... I didn't get to work on the afghan since I was out for the evening! I *am* on the last pair of rows before the three round border, however I have to weave in the ends before I can start that. Well over half the ends were already done, so it won't be *that* bad of an ordeal for me. I'm looking very forward to completing this project, and have already chosen the next UFO to turn into an FO.

All is not lost, as I do have an FO to report. The last of the boot sock samples was finished this afternoon!!! The ladies pair, and the first of the men's were washed and are now hanging on their blockers to dry in the bathtub. I only have one men's sized blocker, so the second sock will need to wait until the first one is dry. I have that particular pattern about 75% done, and the editing shouldn't take very long once the photography is finished.

I had one of the sproggins at home today, so I wasn't able to "work". I still made sure I was productive though! I finished the sock, and cast on another sample sock for a different design. I went into the craft room today to hunt for some sweatshirt fleece, which was located elsewhere as it turned out. I decided to do a bit of organizing in there since it's mostly been ignored lately. I can get in and out, and locate what I need relatively easily again, so I'm pleased with that progress. Once I located the sweatshirt fleece, and the pants pattern for it, I copied the size I needed, and cut out the pieces to make Alex a pair of sweat pants. I also cut the seams off of 2 out-grown, worn out pairs of jeans, so I can now add denim "inserts" inside the pant legs to help reinforce the knees. Add in some housework, and you have what I'd call a pretty decent day!


Till next time,
Nicole =o)


Sent from my BlackBerry® powered by Virgin Mobile.

Monday, March 5

Works in progress...

Just like all of my socks right now, this blog is another work in progress! It's definitely going to take me a bit of time to get all the settings just how I want them. The advantage is that a lot of the content will be dynamic... which means less time needed when I'm doing updates down the road. The source coding is a lot more than what I'm used to, so I will have to decipher it all before I can start fixing it! I'm still encouraging comments and feedback for all of it.

Back to the socks...

I am trucking along on my KD-IDP sample. I was sort-of hoping that I would have it finished today, but no luck there. I have gotten it past the heel turn, and only have a couple gusset decreases left. Fingers are crossed for completion tomorrow, and casting on of the second sock. I really want to have these done by the weekend so that I can get them washed, blocked, photographed, and sent off next week. That will be very satisfying personally, and as an added bonus, another 422 metres on the knitmeter!

I was able to knit a stripe's worth on my Felici sock yesterday too. I want to get at least the first sock done before Derek leaves next Monday. Wednesday I head off to Winnipeg to pick him up from the airport, but he's only home 4½ days this time around. It's looking like my trips into town will only be once a month from now on instead of every two weeks. That means I have a ton of running around to do before the airport. I just hope that Winnipeg Trading Post is open at 9 or 9:30. I want to check out their bead selection. I wasn't able to find them online, and I do recall that they used to do mail order. I'm hoping to find some glass beads larger than the 6/0 I can get here. I also need to run into Ram Wools. I am hunting for some inspirational sock yarns, specifically some Durasport; a yarn swift; and hopefully some circulars for socks. If I still have time, I will be hopping over to Wolseley Wool as well. I haven't gotten an email from them yet, but my fingers are crossed that my crochet hook set is in.

I've been injured!!!

Yuppers... I have a spring cleaning-related injury of all things! It's bad enough how I jab the nerves of my finger with my dpns, and have built up a fairly thick knitting callous, but now I've been damaged by my cleaning rags! I guess I use a lot of strength when wringing it out, since I now have two very tender, and very raw spots on my right hand, exactly where the cloth rubs! I forced myself to finish off the back hallway despite my "disability". That was the goal I had for the day, and I was damned and determined to finish it. However, until my fingers heal up, 90% of the cleaning is up to the kids. Lord, help me with that!!! Dishes and wiping the counters, etc. will be about the extent of my efforts until a healing layer is present. This really derails my momentum, and I certainly hope that I will be able to continue on with my plans by Thursday. That would mean I would only be losing one real day of scrubbing, and since I already had a lot of errands to run, and last minute things to do around here, I am unsure if I would have been able to get much done tomorrow anyway. Wednesday, of course, I will be travelling back and forth to Winnipeg, so nothing can get done around here then.

Saturday, March 3

Picture, picture... who wants a picture?

Finally... for your viewing pleasure... or not, as the case may be, is a selection of FO shots!!!

First we have Derek's denim work socks. After I gave them to him, he then told me that he had enough at the mine site! These will keep his sock drawer at home warm in the meantime!!! I used Denim Tuffy and some scraps of Smoke.

Next we have Denise's slippers. I used the leftovers from the comfort shawl I knit her about a year and a half ago... she matches now!

Third, we have Raith's slippers. These were made with a ball of yarn that was a mystery until the end (RHSS Soft Navy)... I learned how to hand-wind my own centre-pull balls well over 6 years ago, and this ball wasn't wound that way. I had wrapped it around the yarn label, which was the norm for me before learning the other method. That actually came in handy as I had run out of yarn half-way through the second "tongue". Thanks to having so much of my stash catalogued on Ravelry (including bin location) I was able to not only locate another ball of the same yarn, but one of the two listed was even the same dye lot from 2002!

Last but not least are Raith's "Wild" socks. He is the most-wool sensitive person I have ever met! He picked this yarn out of my stash for me to make him a pair of socks with. Since this yarn is Bernat Sox, a 75% acrylic/ 25% nylon blend, I gave them to him with the warning that his feet will sweat and these won't be nearly as comfortable as my other socks.

There are links to all of these projects in yesterday's post since I'm too lazy to grab the links to make my life a little easier. I'll have a longer post tomorrow... I'm pretty well done in with all the spring cleaning I've been doing this past week!

Friday, March 2

I had February goals???

Yes, apparently I did! Although you'd never know it by looking at what I planned to work on and what I actually did work on!

What did I do in February?

Note: As of this writing, a lot/ most of the updated pictures I have, haven't been uploaded to Ravelry yet. I will be working on that over the weekend for many of them. I didn't want to delay this post any longer.
Checking my Rav project page, I have only two FOs to report: my Little Bit Irish Cardigan; and Derek's At-Home Slippers. I worked on my Felici socks while Derek and I were out together, but haven't made much overall progress on them. They are in my purse at all times, so I can always grab my sock and do a round or three when I have an idle moment. I am reconsidering the name I gave them however, "Nearly Instant Gratification" seems to be turning into "Slog Until You Die"!! I started my While Shrug just over a week ago, shortly after finishing my Little Bit Irish cardigan. I had done the swatching for Lissa's ruffled cardigan, but put it aside after getting gauge. I need to follow the pattern for that sweater, and a project like that just doesn't fit in right now. The shrug does because most of it is just stockinette, and it's perfect for something other than a sock when I need no-brain knitting. I started a new design for Ram Wools' Footwork Design contest prior to recieving my KP-IDP yarn Wednesday. I'm really liking how it's turning out, but there won't be project pages (or at least ones with pics other than just the yarn) until much later on this year.

I guess the worst thing about my February progress is that not a single stitch was done on a single afghan or shawl. I do have good afghan news though... The Monsterghan was finally delivered to the recipient, and I placed an order for the Popcorn MAM yarn. Gotta love a 29% off sale, it took care of the outrageous shipping and then some! Of course there's other goodies in there as well!

What will I do in March?

I can sum up that question in one word: SOCKS!! Socks are my biggest priority from now until the contest closing in mid-May. Anything else will simply be as a diversion, or to give my hands a rest from tiny needles. I have my first Footwork design started, and it seems to be going well. That pattern is going to need a lot of editing and clarification for sure... I'm using some new-to-me techniques, and loving every minute of it, but that makes for a few headaches when trying to explain what I'm doing! I have 3 or 4 more in the planning stages written into my notebook, and will be stopping in at Ram's when I'm in Winnipeg next week to source out a few more yarns. I also finally received my KP-IDP yarn support for another design, and while that project is also coming along, I'm having a lot of misgivings on how the colour is pooling. I'm going to get another full repeat or two done before I make my final evaluation on it though. My knitting callous is going to be taking a real beating from tiny needles!!!


Nicole =o)

Thursday, March 1

Shall we try this again? ;o)

Here we go... the start of a new month, and the start of a new try at regular blogging! I will do my month-end round-up/ new-month goals in my next post or two. I also have a picture post of January FOs in my drafts folder too that I need to post! I will now apologize in advance for the extreme random-ness of this post. I seem to have a little bit of everything on my mind today!

So what have I been doing for the last 3 weeks?? Knitting like a mad-woman, that's what!! Little Bit Irish cardigan was finished about a week ago, and I've mainly been concentrating on socks, socks, and more socks! Almost everything else has been put by the way-side due to a new KP-IDP pattern I'm working on the sample for, as well as this year's Footwork contest at Ram Wools. I won first place last year, and I have my fingers crossed for placing in the top 3 again this year. I did start a simple shrug out of Homespun I bought on sale recently, so that I would have a completely brainless knitting project for when my hands can't deal with the fineness of sock needles.

On one of my trips into Winnipeg this past month I picked up 2 different orange sock-weight yarns to shut up my best friend... she insisted that I had to buy myself some orange yarn or she would explode! I found two at Wolseley Wool that inspired me. One is going to be turned into a scarf or shawl with a leafy lace pattern. The other is going to be a simple pair of socks. I'm not sure if I will be doing them generic or designing a pattern for them, but they have already been named... Shut Up Liz Socks!!

Derek continues to rave about his worsted wool work socks out west, and the guys at the mine site with him still think he's nuts for spending that kind of money on a single pair of socks... probably along with me too for knitting them!! Funny thing is that his socks (well his work socks anyway!) are the cheap ones! I can only imagine what they'd think about his $45-ish silk-blend socks! What gets me is that even when Derek proves to them how great his socks are -- the guys can wring out their socks at the end of the day, and Derek (who has very sweaty feet) shows them how his socks don't even feel damp -- they still think his socks aren't all that great. We shall see if they still have that attitude in the summer and can't stay cool!

I have come to the conclusion that I really need to get a voice-activated digital recorder. Now before you tell me that my Crackberry/ speed bump-wannabe has a built-in recorder, I will tell you that I know this, but it's not very user-friendly... at least not me-friendly anyway! I have a tendency to come up with my best design ideas and inspirations while driving. The biggest problem with this is obvious... I can't write down any notes while driving. However, it seems that the worse the driving conditions, the better and faster the ideas are. That's why I need something voice-activated!! If I wait until I get to my destination (or even next stop) to record my ideas, I inevitably will forget something (which of course I remember as soon as I get back on the road!). I found a nice Sony one for under $60 that should suit my purposes perfectly. With three hours of solitary driving time every two weeks, I can see it getting a lot of use!


Nicole =o)

Wednesday, February 8

Travelling is tiring!

It's been a very long day for me. I had to get up at 4am to drive into the city to pick up Derek from the airport, and then turn right around and come back home!

At least I didn't come home empty handed... I stopped at Wolseley Wool and got a few things. First on the list was "orange yarn" to shut up my best friend, Liz. She's been telling me for about a month now that I had to get some orange yarn or she would explode! I got a cool hand-painted sock "blank" from Flat Feet, and a nice orangey wool/ alpaca blend from ONline. I also wanted to get some more removable stitch markers for my cardigan, but they were out of stock. I did manage to pick up a new crochet hook to try out to see how my wrist handles it, and a package of straight Chibi's. I also ordered a set of interchangeable crochet hook frojm Knitter's Pride, now that they are available in Canada. I'm looking forward to trying them out.

The only knitting that was accomplished was the leg of Derek's work sock. One of his work buddies caught a ride home with us, so with 3 of us sitting on the one bench seat in the truck, it was the easiest to manage. At least I'll be able to get the sock itself finished in the next few days!

Sunday, January 1

Facing it... and avoiding it...

Anybody who knows me, knows that I find different ways of avoiding things when I can. When I'm very stressed out about something, especially something that's out of my control, I tend to "escape" and typically that's into my video games mostly. It's the easiest way for me to occupy my brain with something brainless. That's why I was playing my games like nuts on Facebook Friday night... keeping my mind off of our loss.

During the day I did a ton of searching and such for my queue, and project plans for next year. It was a great way to focus my attention away from what was going on around me, and getting something accomplished as well. If you go back through my blog archives, you will find that quite frequently, my "avoidance days" are often my most productive days... just in other things!

So just what did I manage to accomplish?

Firstly, I discovered that any search for a cardigan pattern on Ravelry can not include "free" patterns unless you have about 4 days to go through all of the possibilities! I narrowed my search parameters to just what I already have in my vast library. With the selection of a few criteria, my choices were now down to just over 250 (from the well over 3000 when I included "free"!). This was a much more manageable list to go through. All of the ones that interested me enough, I added to my Ravelry favourites listing, along with a few keywords to help me sort through them later. After a few hours were spent on that, the 250-ish was down to about 30 realistic options. I tend to keep very few things saved in my queue and favourites, mainly using them for a "true" listing of what I want to make. Next, I went through the remaining patterns, and refined it all... adding yarn, size info; suitable Knit Picks yarn choices and the like. I ended up adding 5 (I think) of these to my queue, leaving the remainder in my favourites for the time being.

I am extremely serious about becoming more focussed in my projects this coming year. I want a sweater a month, a shawl a month, a design a month, a pair of socks a month, and an afghan a month! Those are pretty lofty goals, but since I already have some of these in progress, and the design can go hand-in-hand with one of the other categories, it isn't completely out of my reach. Now that I had quite a few sweaters and shawls in my queue, the next order of business was to get it all sorted. I added the tag "2012plan" to the projects I wanted to concentrate on the most... the sweaters and shawls... many in kit form just waiting for me to start them. After a lot of fiddling around with project order, and tags, and what still needed yarn to be purchased, I now had a game plan for most the first six months of 2012.

Nicole's Project Plan - January-June 2012

I realize that I haven't planned afghans or socks for March and beyond. I have the rose-coloured afghan, and Wayne's afghan to finish, as well as a new design that's intended for Alex that I need to work on a bit and see if it will be accepted into the KP-IDP. I also have several other UFO/ WIPs in various states of completion. When it comes to socks, I'm never at a loss for projects! Derek is in desperate need of work socks, and I have several designs that need finishing up. As the end of February draws near, or I complete my January/ February goals, I can then decide what projects to spend my time on next.

Since beginning quilting and starting to sew again are also goals of mine for this next year, I am strongly considering creating a weekly plan... this day is for sewing... that day is for afghans... this day is for sweaters... you get the idea. I won't be able to purchase any of the quilting and sewing supplies I want/ need until the end of the month at the earliest, so whatever day I choose for sewing will be a "craft room organization day" for the time being. Sundays used to be for end-weaving, and that's what I want to do again... weaving in ends, and other project finishing details including photography. Monday is traditionally my "heavy cleaning" day, so working on the craft room fits in well there. That leaves me five more days to "assign", and I can work on that once the kids go back to school on the 9th (or is it the 10th). By that time Derek will be gone too, so I should have a couple of weeks to work on this "system". Fingers crossed that I can have that all sorted by the end of the month.

Wish me luck... oh, and HAPPY NEW YEAR!!!


Nicole =o)

Wednesday, March 30

You ought to be in pictures!!!

First of all, please excuse the poor formatting for this post... I'm a bit out of practice with my HTML tags and such!! In any case, I'm happy to showcase a couple of recent design photos. Below is the official photo for the sock pattern Walk in the Garden. It's worked in sportweight wool on 2.75mm needles. It was originally designed for Ram Wools' footworks 1.0 design contest.


Below is the baby afghan I've named Manny. I created a new stitch for this design that gives it a thermal quality.


Below is a photo of one of the knitted MAM strips for the pattern Melissa. It's knit with a soft worsted weight yarn on 5.0mm needles. I'm really liking how it's turning out.


Wednesday, April 2

What the hell?!?

No, this isn't a late April Fool's joke... it's really me!!! I know it's been a long hiatus, even for me, but it's good to be back. One of the main reasons I haven't been around is because I had lost my internet access for 2 months. It was quite difficult surviving without any contact with my friends at all since I'm so isolated out here! Oh well... what's past is past! Let's get on with some progress info! I want to get this posted, so pics will have to follow... there are a few pictures in my Flickr though, as well as all of the project info in my Ravelry notebook.

These are the projects I can remember finishing since I was last on Blogger:
Lissa's garter rib scarf is done! Even with the couple of errors in the pattern, it worked out well. I've heard through the grapvine that many of the patterns in Magknits have problems with errors that are never fixed. I find this disenheartening since one of the patterns in my Ravelry queue is a cool looking pair of socks from there.

Rebecca's snake scarf is done. I remember having a few difficulties with this pattern as well, and was quite disappointed since I had just gotten over the troubles with Lissa's scarf. Overall I'm very pleased with how it turned out.

Derek's work socks are also finally complete! This is the same pair that I cast on right after finishing Henry's back in October. They were put on the backburner while I worked on winter items, and were finally picked back up and finished in late March. I won't be starting any new work socks for him for a little while. Only working on these socks during breaks at my jobs made this a *very* long project to complete.

My blue stole was finished over this last weekend. When I went to update my sidebars, I realized that I hadn't even added it!!! I started this shawl well over 2 years ago... before Camille's had even closed! Derek and I were at Michael's, and he helped me choose the pattern as well as the yarn. I had cast it on, and had gotten about one ball into the project when I put it aside. The last time I can recall working on it prior to the last little while was when I was in Thompson 2 years ago this June!

I've got two new projects on the needles currently:
My Step socks. I'm making myself a pair of generic stockinette socks out of a ball of Austermann Step that I bought last year in Calgary. When I first started them on 2.0 mm dpns, I found the yarn to be horribly splitty. I restarted them on 2.25s with much better results. I did have to increase my usual number of cast on stitches, but the sock is still working up fast. As of this writing, I am just coming up on the heel flap and turn.

My Mystic Ocean shawl. I have finally started the Mystic Waters KAL shawl. This KAL was actually held in the fall, but I had neither the time, nor the supplies to do it then. When we took a recent trip to Winnipeg, I picked up some Estelle Watercolours and an Addi Lace needle to complete this shawl. The colourway I chose screamed "Green Ocean" to me, so it was the perfect choice for my project. As of this writing I'm nearly complete the second of eight charts... Row 95-ish of about 350-ish.

With the weather warming up outside, I have been able to knit during my coffee breaks at both jobs, not just lunch breaks, so that really helped in getting Derek's socks done, as well as the amazing progress on my Step socks already. My shawl is my computer/ living room project, and is going quite well even though I'm left with a halo of mohair fuzz all over my clothes every time I work on it! Even though I have Alex's hoodie listed as a WIP on my sidebar, it's currently actually a UFO. I need to find the pattern yet again!!! I'm finding that concentrating on just one project at home, and one travelling project is currently the best use of my knitting time.

Wednesday, December 26

January sock-a-longs and goals...

2008 Sock-a-long: January is a ribbed pattern, so my goal for this group will be to finish the pair of work socks I have OTN for Derek.

6 Sox Knitalong: This is a KAL group that makes 6 pairs of socks a year, one sock per month.

Sockamania: I have just joined this group, which is available for everyone to join on the blog. Once I receive my first pattern, I will decide whether or not I will participate.

Socknitters Anonymous: Another challenge group to knit more socks! The January assignment is a Cookie A. pattern or intarsia. None of the Cookie patterns have really inspired me that much, and I'm not interested in trying intarsia at this time, so I'll sit out this month.

Socknitters SAM: Another Yahoo Group that makes one pair of socks every two months. The January-February pattern hasn't been announced yet as of this writing.

Thrifty Knitters Sock Club: The patterns chosen for January are Bellatrix and Cabletini, but neither really inspire me that much. I may do the Bellatrix at another time, however. In the meantime, I'll just sit out this month with this group.

Monday, December 17

WTH?? Where's Nicole???

It's been a tumultuous time for me lately. I'm not going to get into the nitty gritty of the details, but suffice it to say that things have finally started to turn around for us. With all that turmoil over {or nearly so}, I've been able to get back to thinking about myself and what I'd like to accomplish. Part of this is also blogging again. I've joined a multitude of groups and "alongs" to try and get myself motivated, as well as follow a few of my interests. Now what I need to do is sit down and actually establish realistic goals for myself, that includes taking care of the house as well as my projects and stash. Of course, this will all need to fit into my typically harried lifestyle/ work schedule. I will post my goals for the month on the first day of the month, and I will start draft posts for the end of each month to upload on the last day to hold myself accountable for those goals.

My stash: This needs serious reduction in the worst way. Part of that will require actually inventorying it so that I know what's there, and can congratulate myself accordingly when milestones/ goals are met. I want to have an inventory listed in Ravelry of what's currently inside my craft room by the end of January. I think that's realistic considering just *how* much yarn there is in there. As an added bonus, it will help organize the room better. Once I know where I'm at, then I can start setting goals towards working through it.

My current projects: I have more projects on the go right now than I possibly know what to do with. I've been trying quite hard to focus on one project at a time more lately, but I have yet to make any *real* difference in my amount of WIPs/ UFOs. I am progressing faster on individual projects since I'm not switching back and forth constantly, but I am still finding the lack of FOs to be discouraging. I need to figure out what to do about this.

My wish list of projects: I have several shawls that I would like to make in the new year, as well as a few a-month groups that I've joined. I'll need to find a place to organize all that, as well as set goals so that I'm not overwhelmed with WIPs. In the case of shawls, I want to finish my Snowdrop shawl, and then start on my Mystic Waters shawl.

Photographic proof & accountability: I am seriously behind in taking FO and stash shots. I want to have all of my FOs photographed by the end of the year, and all stash photographed as it is logged into Ravelry. Part of this will also be making sure that my sidebars in here in Blogger are up-to-date.

My home: Between insane work schedules and a serious case of the I-don't-give-a-damn's, my home has been seriously neglected. I have decluttering, redecorating, and yard/ garden plans that I'd like to institute here. I intend to start this by decluttering the living room, dining room, and kitchen, as well as redecorating them. I have already made many of my redecorating decisions, it's just a matter of budgetting them to make them a reality.




In closing, I just want to {re}state my goals for the month of December.
  1. Photographs of all FOs listed in Ravelry.
  2. Blog sidebars completely up-to-date.
  3. Decide on first three projects to focus on as of January 1st.
  4. All a-long's and a-month's listed *somewhere*.
  5. Computer desk and bookcase in living room completely decluttered.

Thursday, November 15

I'm at 20!!! Holy Crap!!!

Well it's official... I've hit the 20 pair mark for this year! That makes my average a little under 2 pairs a month, which is nothing to be ashamed of, unless you include the fact that my sock yarn stash doesn't seem to be getting any smaller!!! That's another 420 metres added to my total, which is now at 6087 metres... I'VE BROKEN THE 6 KM MARK!!!

On Tuesday afternoon I did the final stitches on the "Boss Wife Socks". These are the socks that I knit for the wife of Derek's boss Henry... whose socks were the last sock FO featured here. They've really been wonderful in everything they've done for us since {and even before} we moved out here, and it's just a small token of how much I {we} appreciate it. Clicking on the picture will take you to the Flickr page for it, or you can visit my main Flickr page to see all of my photos. If you want more details on these socks, leave me a comment, or go visit the project page on Ravelry. Of course you can view all my projects on my main projects page on Rav too!

Sheri's Socks

Thursday, November 8

What *did* I accomplish?

Other than teaching my kids a few new curse words that were directed at my craptastic ISP over the last few days, I did manage a few productive things as well!

I got the table topper blocked and photographed... the pictures will follow in a day or so.
I made a between-projects dishcloth... part of my 10 dishcloths challenge.
I got nearly 2 full 2-pattern repeats done on the snowdrop shawl... status pic to follow in a day or so.
I got the heel flap, heel turn, and gusset picked up on the Tofu socks.
I got the ribbing done on Sheri's sock so that it's now a mindless knitting project.
I got 3 repeats of my sock design pattern done.
I frogged a cardigan I'd started for Lissa, and got the yarn balled up.
I frogged a pullover for Alex and restarted it in the round.
I cleaned out the inside of my computer and partially set it up in my craft room.
I located more of the "Lissa stash", and 2 different camo yarns for projects to work on while I teach knitting to a co-worker.

I still haven't decided what I'll be working on as my 3 projects... I will probably have to make it either 4 or 5, since I'll have 2 different ones going at work. Stay tuned!

Monday, November 5

It's done, done, done!!!

Yes!!! The three-day table topper is officially finished! I did the last few stitches on it when I got home from work this morning, wove in the ends, and washed it. As soon as I'm done this post, I'll be blocking it out and then going to bed. I'll get pictures of it up tomorrow probably. I won't be making a matching one after all... we don't carry the DMC Traditions at this store... that makes *that* decision a little easier!!!

Derek went digging in the store yesterday and found all kinds of goodies for me! I now have the power cord to one of my sewing machines, so I can finally get started on a bit of that! He also found a bag with a few balls of sock yarn in it... why wasn't that in my sock yarn bin? In any case, that's giving me the motivation to finally post some more of my stash on Ravelry.

I've started the heel turn on my Tofu socks, but I don't know what I want to work on here at home now that the table topper is finished. I joined a group that has you pledge to work on only three projects at a time. Well the Tofu is one, and I can't decide on the other two since I've got about seven different projects in front of me here at the computer, all in differing stages of completion.

Here are the choices:
  • Lissa's cardigan - nearly done
  • Lace shawl - barely started
  • Blue shawl - about 25%
  • Sheri's socks - just started sock #2
  • New sock design - about 4" knit of sock #1
  • Derek's socks - just started sock #1
  • Ripple ghan - 25%-ish

What do you think my choices for #2, and #3 should be? Leave me a comment and let me know!

Monday, October 29

And now as promised... PICTURES!!!

Yes! I've actually got the photographic proof that I've been accomplishing something around here. The only thing that didn't make it into this shoot was my new sock design. I'm going to keep that under wraps for the moment. I've uploaded blog-sized photos here, but if you are interested in seeing the larger versions, you can view them on my Flickr account. I also have some recent family shots added there as well.

Here's the finished photo of the socks I made for Derek's boss as a thank you for all the help and such they've given us. I hope he likes them! I even included a little card titled: "The Care and Feeding of your Hand-Knit Socks"!
Henry's Socks

Here's where I currently am with my first laceweight project, Steph's "Snowdrop Lace Shawl" done in Clea on 4 mm needles.
Snowdrop Lace Shawl

This is the current state of my blue shawl. It's around 16" and I've used up 2 balls of Patons Glittallic on it so far. Derek chose the yarn and the pattern, so I'm looking forward to finishing this one.
Blue Diamond Lace Shawl

2 balls down... ? to go???

I've been nursing my *illness* today mainly by knitting away on stuff. I've just finished the second ball of Patons Glittallic in my "Blue Stole". I have no idea how much of this stuff I still have lying around, but I'm guesstimating that there's at least 8 in total since the original pattern called for 6. It's going to be very nice once completed, and will actually be useful somewhat.

I've also done the first lace repeat of my new sock design, and did a repeat on my snowdrop shawl. I didn't get any pictures taken because I didn't feel up to going outside for a photo shoot, but I did get my template updated a bit to reflect my recent progress.

Nineteen and counting!!!

Well, it's official now... I've finished my nineteenth pair of socks this year. The "Boss" Work Socks are done. I'll be taking pictures the morning and posting them then, but I just had to brag now!!! I've cast on another pair of work socks of course! This pair is an oatmeal pair with green stripes for Derek. Until I get my initial order from Briggs & Little for the store, I only have one more pair's worth of Tuffy left in my stash. I *finally* started my paperwork for becoming a retailer, so hopefully that will all be getting off the ground very soon. I also cast on a pair using the yarn that Derek bought for me when he was in Winnipeg last month. This pair will be one of the new designs I'm hoping to feature at the store when I get it back online.

Wednesday, October 17

A little dab will do ya!

Well the last few days have been a little bit of this, and a little bit of that... the sum total of which is actual progress!!!

I've been knitting mostly on Lissa's shawl. I've finished off the first ball of yarn, and am now well into the second. It's now measuring around 34" across the top. I've decided to work on that rather than her sweater until it's done. At this rate, that should only be a few days. My goal is to have it done before my weekend ends.

My other accomplishment this "week" has been completing my Tofu sock #1, and starting the second sock. Since I have at-home projects that I'm focussing on, this will be mainly done as an at-work project. I'm looking forward to having another finished pair of socks soon!