I just finished casting off my first FO of 2013, a project I've named "Rainbow Wrap". It was a kit I ordered from Mary Maxim last spring, "Shimmering Lights Wrap" and made with their Shimmer yarn. I still need to weave in the ends, and do the washing and blocking, but for all intents and purposes, it's done.
Overall, I'd have to say that it was an enjoyable knit. Unlike the MM Mohair Glitter yarn I used a year and a half ago (The Mohair Blob in my Ravelry projects), this yarn was a joy to work with. The sequins are spun into the yarn using an embroidery floss-like thread, but the plies don't shift on each other at all. The pattern that came with the kit was fairly easy to follow, and seemed to go really fast since the lace stitches were on both the knit *and* purl sides of the project. Out of the 4 balls of yarn included, there was only 1 knot in the middle of one. However, I *did* notice that the colour repeats weren't always consistent. Occasionally they would reverse themselves or be wound in the ball "backwards". This was inconsequential since the colour shifting was very smooth. Even when changing g balls of yarn it was easy to match up. If I would have done one less pattern repeat on the second half, even the graft at the middle would have been colour matched.
I will block it over the next couple of days and then get some FO pics posted. I can't wait to wear it!
Nicole Rodgers' musings and meanderings on her crafts... and life in general.
Showing posts with label FO reports. Show all posts
Showing posts with label FO reports. Show all posts
Thursday, January 3
Friday, September 14
(U)FO Friday...
Well today's FO isn't my UFO. I was hoping to have the basket weave afghan finished by tonight, but it just wasn't in the cards. I can *partially* blame it on knit night last night... I didn't get to work on the afghan since I was out for the evening! I *am* on the last pair of rows before the three round border, however I have to weave in the ends before I can start that. Well over half the ends were already done, so it won't be *that* bad of an ordeal for me. I'm looking very forward to completing this project, and have already chosen the next UFO to turn into an FO.
All is not lost, as I do have an FO to report. The last of the boot sock samples was finished this afternoon!!! The ladies pair, and the first of the men's were washed and are now hanging on their blockers to dry in the bathtub. I only have one men's sized blocker, so the second sock will need to wait until the first one is dry. I have that particular pattern about 75% done, and the editing shouldn't take very long once the photography is finished.
I had one of the sproggins at home today, so I wasn't able to "work". I still made sure I was productive though! I finished the sock, and cast on another sample sock for a different design. I went into the craft room today to hunt for some sweatshirt fleece, which was located elsewhere as it turned out. I decided to do a bit of organizing in there since it's mostly been ignored lately. I can get in and out, and locate what I need relatively easily again, so I'm pleased with that progress. Once I located the sweatshirt fleece, and the pants pattern for it, I copied the size I needed, and cut out the pieces to make Alex a pair of sweat pants. I also cut the seams off of 2 out-grown, worn out pairs of jeans, so I can now add denim "inserts" inside the pant legs to help reinforce the knees. Add in some housework, and you have what I'd call a pretty decent day!
Till next time,
Nicole =o)
Sent from my BlackBerry® powered by Virgin Mobile.
All is not lost, as I do have an FO to report. The last of the boot sock samples was finished this afternoon!!! The ladies pair, and the first of the men's were washed and are now hanging on their blockers to dry in the bathtub. I only have one men's sized blocker, so the second sock will need to wait until the first one is dry. I have that particular pattern about 75% done, and the editing shouldn't take very long once the photography is finished.
I had one of the sproggins at home today, so I wasn't able to "work". I still made sure I was productive though! I finished the sock, and cast on another sample sock for a different design. I went into the craft room today to hunt for some sweatshirt fleece, which was located elsewhere as it turned out. I decided to do a bit of organizing in there since it's mostly been ignored lately. I can get in and out, and locate what I need relatively easily again, so I'm pleased with that progress. Once I located the sweatshirt fleece, and the pants pattern for it, I copied the size I needed, and cut out the pieces to make Alex a pair of sweat pants. I also cut the seams off of 2 out-grown, worn out pairs of jeans, so I can now add denim "inserts" inside the pant legs to help reinforce the knees. Add in some housework, and you have what I'd call a pretty decent day!
Till next time,
Nicole =o)
Sent from my BlackBerry® powered by Virgin Mobile.
Saturday, March 3
Picture, picture... who wants a picture?
Finally... for your viewing pleasure... or not, as the case may be, is a selection of FO shots!!!
First we have Derek's denim work socks. After I gave them to him, he then told me that he had enough at the mine site! These will keep his sock drawer at home warm in the meantime!!! I used Denim Tuffy and some scraps of Smoke.
Next we have Denise's slippers. I used the leftovers from the comfort shawl I knit her about a year and a half ago... she matches now!
Third, we have Raith's slippers. These were made with a ball of yarn that was a mystery until the end (RHSS Soft Navy)... I learned how to hand-wind my own centre-pull balls well over 6 years ago, and this ball wasn't wound that way. I had wrapped it around the yarn label, which was the norm for me before learning the other method. That actually came in handy as I had run out of yarn half-way through the second "tongue". Thanks to having so much of my stash catalogued on Ravelry (including bin location) I was able to not only locate another ball of the same yarn, but one of the two listed was even the same dye lot from 2002!
Last but not least are Raith's "Wild" socks. He is the most-wool sensitive person I have ever met! He picked this yarn out of my stash for me to make him a pair of socks with. Since this yarn is Bernat Sox, a 75% acrylic/ 25% nylon blend, I gave them to him with the warning that his feet will sweat and these won't be nearly as comfortable as my other socks.
There are links to all of these projects in yesterday's postsince I'm too lazy to grab the links to make my life a little easier. I'll have a longer post tomorrow... I'm pretty well done in with all the spring cleaning I've been doing this past week!
First we have Derek's denim work socks. After I gave them to him, he then told me that he had enough at the mine site! These will keep his sock drawer at home warm in the meantime!!! I used Denim Tuffy and some scraps of Smoke.
Next we have Denise's slippers. I used the leftovers from the comfort shawl I knit her about a year and a half ago... she matches now!
Third, we have Raith's slippers. These were made with a ball of yarn that was a mystery until the end (RHSS Soft Navy)... I learned how to hand-wind my own centre-pull balls well over 6 years ago, and this ball wasn't wound that way. I had wrapped it around the yarn label, which was the norm for me before learning the other method. That actually came in handy as I had run out of yarn half-way through the second "tongue". Thanks to having so much of my stash catalogued on Ravelry (including bin location) I was able to not only locate another ball of the same yarn, but one of the two listed was even the same dye lot from 2002!
Last but not least are Raith's "Wild" socks. He is the most-wool sensitive person I have ever met! He picked this yarn out of my stash for me to make him a pair of socks with. Since this yarn is Bernat Sox, a 75% acrylic/ 25% nylon blend, I gave them to him with the warning that his feet will sweat and these won't be nearly as comfortable as my other socks.
There are links to all of these projects in yesterday's post
Friday, March 2
I had February goals???
Yes, apparently I did! Although you'd never know it by looking at what I planned to work on and what I actually did work on!
Checking my Rav project page, I have only two FOs to report: my Little Bit Irish Cardigan; and Derek's At-Home Slippers. I worked on my Felici socks while Derek and I were out together, but haven't made much overall progress on them. They are in my purse at all times, so I can always grab my sock and do a round or three when I have an idle moment. I am reconsidering the name I gave them however, "Nearly Instant Gratification" seems to be turning into "Slog Until You Die"!! I started my While Shrug just over a week ago, shortly after finishing my Little Bit Irish cardigan. I had done the swatching for Lissa's ruffled cardigan, but put it aside after getting gauge. I need to follow the pattern for that sweater, and a project like that just doesn't fit in right now. The shrug does because most of it is just stockinette, and it's perfect for something other than a sock when I need no-brain knitting. I started a new design for Ram Wools' Footwork Design contest prior to recieving my KP-IDP yarn Wednesday. I'm really liking how it's turning out, but there won't be project pages (or at least ones with pics other than just the yarn) until much later on this year.
I guess the worst thing about my February progress is that not a single stitch was done on a single afghan or shawl. I do have good afghan news though... The Monsterghan was finally delivered to the recipient, and I placed an order for the Popcorn MAM yarn. Gotta love a 29% off sale, it took care of the outrageous shipping and then some! Of course there's other goodies in there as well!
Nicole =o)
What did I do in February?
Note: As of this writing, a lot/ most of the updated pictures I have, haven't been uploaded to Ravelry yet. I will be working on that over the weekend for many of them. I didn't want to delay this post any longer.Checking my Rav project page, I have only two FOs to report: my Little Bit Irish Cardigan; and Derek's At-Home Slippers. I worked on my Felici socks while Derek and I were out together, but haven't made much overall progress on them. They are in my purse at all times, so I can always grab my sock and do a round or three when I have an idle moment. I am reconsidering the name I gave them however, "Nearly Instant Gratification" seems to be turning into "Slog Until You Die"!! I started my While Shrug just over a week ago, shortly after finishing my Little Bit Irish cardigan. I had done the swatching for Lissa's ruffled cardigan, but put it aside after getting gauge. I need to follow the pattern for that sweater, and a project like that just doesn't fit in right now. The shrug does because most of it is just stockinette, and it's perfect for something other than a sock when I need no-brain knitting. I started a new design for Ram Wools' Footwork Design contest prior to recieving my KP-IDP yarn Wednesday. I'm really liking how it's turning out, but there won't be project pages (or at least ones with pics other than just the yarn) until much later on this year.
I guess the worst thing about my February progress is that not a single stitch was done on a single afghan or shawl. I do have good afghan news though... The Monsterghan was finally delivered to the recipient, and I placed an order for the Popcorn MAM yarn. Gotta love a 29% off sale, it took care of the outrageous shipping and then some! Of course there's other goodies in there as well!
What will I do in March?
I can sum up that question in one word: SOCKS!! Socks are my biggest priority from now until the contest closing in mid-May. Anything else will simply be as a diversion, or to give my hands a rest from tiny needles. I have my first Footwork design started, and it seems to be going well. That pattern is going to need a lot of editing and clarification for sure... I'm using some new-to-me techniques, and loving every minute of it, but that makes for a few headaches when trying to explain what I'm doing! I have 3 or 4 more in the planning stages written into my notebook, and will be stopping in at Ram's when I'm in Winnipeg next week to source out a few more yarns. I also finally received my KP-IDP yarn support for another design, and while that project is also coming along, I'm having a lot of misgivings on how the colour is pooling. I'm going to get another full repeat or two done before I make my final evaluation on it though. My knitting callous is going to be taking a real beating from tiny needles!!!Nicole =o)
Friday, February 3
Project Progress Updates
I have been quite busy lately, as you can see by the knitmeters on my sidebar. I have also been tracking how much yarn I've bought so far this year, and it's nearly an even amount. My goal for the year is to use more than I buy, and for this, sock yarn does count as stash!
I am now finished all of the commissioned projects I had in my queue. All that's left is washing and delivery! I haven't had time to take any pics yet or upload them, but I'm hoping to get that done tomorrow. For this week I have finished off Raith's socks, started and finished Raith's slippers and Neecie's slippers, started a pair of work socks for Derek and finished the first one.
For the next few days I want to continue finishing off a few things. My tweed cardigan is expected to be finished by Wednesday (according to Derek anyway LOL!), the second sock for Derek should be done, as well as a pair of slippers for him. I also want to get the Gumdrop Placemat set finished up for pattern release.
Wednesday, February 1
January Round-up
Well, just how well did I do with my goals? Not too well it appears, but I did get quite a bit done regardless! This is what I had on January 1st as my knitting/ crocheting goals for the month of January:
Sweater: Tweed Cardigan (Mary Maxim kit); Shawl: finishing the Denise design; Afghan: finishing Derek's Popcorn MAM; Socks: finishing my Felici socks (Caprica colourway).
- The tweed cardigan isn't finished, but I did spend 2 weeks mostly concentrating on the popcorn afghan. As I had posted earlier, I recovered from having to rip back so much of my early work due to missed increases, but that was a loss of at least 2 days worth of knitting. I started work on it again the day before Derek returned, and got it divided a few days later. I went through well over a ball of yarn while he was home for the 5 days. I still have the sleeves to do, the stitches are on holders right now; and the body is about half done. I'm on the 4th ball of the 8 included in the kit, and Derek expects me to be wearing it when I pick him up from the airport next Wednesday. It's a fast, and mindless knit, so it is an achievable goal... it all depends on what else I decide to work on.
- I didn't touch the shawl at all =o( (no links since it's a design in progress)
- The popcorn MAM didn't get finished, but it wasn't for a lack of trying. Firstly, it wasn't nearly as complete as I first thought. I had wanted to surprise Derek with it finished when he came home. I realized that I wouldn't be able to finish it in the 2 weeks that he was gone initially, as I needed approximately another week or so. I then discovered that I didn't have enough of the dark sage yarn to finish up the afghan. I checked my stash, and according to my Ravelry listings, I have NONE!!! It would be my guess that I had used a lot of it on his quiltghan back in 2002 or 2003... knowing then that I could easily buy more. Unfortunately 10+ years later, that is no longer the case. The colour is still being made, but nowhere I shop (or can get to) carries that colour. I will need to order more from Herrschnerrs, the only place online I could locate that colour. I had considered re-working it to become a "striped" afghan... using a different colour scheme for alternating strips... that way I could keep it a surprise still. The more I thought about it, the more I leaned towards letting Derek know, and letting him make the final decision on it. He decided that he wants it all to be in the sage colourways, so I'm ordering the additional yarn needed when I next get an email letting me know about a free shipping offer.
- The Felici socks were worked up to picking up the gusset stitches, and left at that point. As much as I love the socks, and love working with the yarn, my priorities dictated that I work on Raith's socks and other projects that were "needs" rather than "wants". They still went with me everywhere, but spent the majority of the month being shown off, rather than knitted on.
What got finished?
- Raith's socks. I finished the first sock on the 26th or 27th I think (checked my tweets for a guesstimate), and of course immediately cast on the second. That one was finished on Sunday (2-3 days), which seems to be quite typical of my second socks... what the first one takes in weeks, the second one is done in days!
- Derek's travelling slippers. Derek travelling means new slippers... this is a tradition born of necessity for over 10 years now. I wasn't up to making him slippers when he originally left in December, and as it turns out, it was a false start anyway. I had him pick out a ball of yarn from my "scraps" bin the day before he left and whipped them up in time for him to get them in his luggage before we went to bed that night.
What's in progress?
- Derek's denim work socks. I cast these on right after finishing Raith's socks on Sunday. I've been meaning to get some more socks done for him, but haven't since I nearly killed my hands doing two pairs back-to-back for his b-day/ our anniversary in June last year. One of his pairs of socks is about to blow out, and I forced myself to buy 2 pairs worth of Tuffy when I was in Winnipeg dropping him off last week. When I got home and tried to put the yarn away in the bin Derek and I had bought for worsted wools, it wouldn't all fit! I did go out and buy another, larger bin, but at the same time I went hunting for the 2 hanks of Tuffy I had balled up back in the summer. As of this writing, I am FLYING through the first sock. I got the stripes done Sunday before bed, the leg done Monday, the heel flap/ turn done and gusset picked up before I went to knit night last night. For whatever reason, my fingers flew while I was there, and I'm now nearly at the toe. I fully expect to be grafting the toe tonight! It would be nice to have them waiting for Derek when he gets home next Wednesday.
- Raith's slippers. These were also started on Sunday. I have been facing my ever-growing queue, and am seeing the list loom over me like the Sword of Damocles. Derek wants to go into Winnipeg for the weekend later this month, so I need to have the entire order he placed from the fall complete by that time. This pair of slippers, and one more is all that is left. These slippers would have been sewn up last night, but yesterday morning I ran out of yarn a few rows away from the second tongue being finished. It was a "Maxwell Smart" moment... "I missed it by that much!" I knew the yarn was well over 6 years old, since it was wound into a regular ball of yarn and I've been doing centre-pull balls by hand for at least that long. I was guessing at what yarn it was when I created the Rav entry, but when I got to the end of the ball, I discovered that I had wrapped the ball around the yarn label. Thanks to having my stash so well documented on Ravelry, I was able to find out that not only did I have 2 full balls of this exact yarn in my stash (and in which bin), but one of them was the same date code of "No Dye Lot" yarn as what I had been using! (2002 by the way!) Rebecca waited over 6 hours, and didn't go get the ball for me until just before I left for knit night, so the tongue wasn't completed, and I couldn't sew them up there like I had originally planned.
What about my other goals?
- Releasing a pattern a month: I didn't get a pattern released... in fact I didn't really work on any designs this month at all. I did, however, submit an existing (but unreleased) pattern to the KP-IDP for consideration. I do have the Gumdrop Placemat Set dug out of the craft room, and here in the living room with me so that I will get the last of the samples finished, photographed, and can release the pattern.
- Continue listing everything on Ravelry: This is an on-going process. I have been very vigilant about making sure that each new purchase is listed in my Ravelry databases. I am also tracking yardage of how much I buy... in the hopes that I will use more than what I bring in this year. A small amount of stash from the "front room" was brought in for me to catalogue, but I haven't made a huge effort in that direction this month.
- Promoting myself more: I didn't do as much of this as I had intended to, but I still did more than what I have been doing. I have added a few more patterns to my Facebook page, I have registered at Craftsy (but haven't listed anything there yet), and have been tweeting a little more often. I have continued to be active on Ravelry, but not in a promotional sense. I am trying to make blogging and tweeting more of a habit... we shall see if I'm more regular with that in February than I was in January!
- Stash and craft room reorganization: This particular goal got little more than "a lick and a promise" this past month. I made small, baby steps in a few things, but most importantly, I didn't make any backwards steps.
All in all, I have to say this was a pretty successful month as far as progress goes... just look at the yarn meters on the left column! No, I didn't achieve the goals I had set for myself, but I didn't give up either. I kept going, kept trying, kept making progress. Since last night was knit night, I will do my February goals post tomorrow. I will also need to do a progress/ FO photo post in the next couple of days. I have linked to my Ravelry project pages for those of you that are interested and taking a look at the details. I have them shared publicly, so you don't need a Ravelry account or to sign in to view them.
Wednesday, January 4
Travelling means slippers!
I can't recall exactly when the tradition started, but whenever Derek travels, I make him a new pair of slippers. He used to "blow through" a pair every time he went away, so I simply began making him a new pair before he left! Well, he has needed a new pair for some time now, and since his flight is at 7am, I figured it was about time I made some! I'm proud to announce my first FO of 2012: Derek's Travelling Slippers
I have also set up knitmeters on the sidebar to note how much yarn I've worked through this year. I downloaded my stash database on Ravelry, and it's over 170 km of yarn! Since this project was about 183m, that means I crocheted up 1/1000th of my stash! LOL! I will only be adding to that total as a project is finished, so the numbers will stay static until projects are done.
I am currently working on the yoke of my cardigan while I wait for the time for Derek and I to leave for the airport. I'm not getting the 3+ hours of knitting time as I had hoped because his 7am flight requires us to leave home by 2am! I can knit by feel somewhat, but I can't knit in total darkness. Here's how the collar turned out:
I will keep on working on this until it's time to get ready to go in about an hour or so. We printed up the pattern for the rose-coloured afghan today, so I'm pretty sure that Derek thinks that is the project I will be working on... won't he be surprised when he returns?!? I'm also hoping to have the cardigan done, or nearly done by the time he gets back. The cardigan, the popcorn afghan, and the commissioned projects will definitely keep me busy mindlessly for when I need a diversion from my mind wandering to places that it best not wander off to.
Nicole =o)
I have also set up knitmeters on the sidebar to note how much yarn I've worked through this year. I downloaded my stash database on Ravelry, and it's over 170 km of yarn! Since this project was about 183m, that means I crocheted up 1/1000th of my stash! LOL! I will only be adding to that total as a project is finished, so the numbers will stay static until projects are done.
I am currently working on the yoke of my cardigan while I wait for the time for Derek and I to leave for the airport. I'm not getting the 3+ hours of knitting time as I had hoped because his 7am flight requires us to leave home by 2am! I can knit by feel somewhat, but I can't knit in total darkness. Here's how the collar turned out:
I will keep on working on this until it's time to get ready to go in about an hour or so. We printed up the pattern for the rose-coloured afghan today, so I'm pretty sure that Derek thinks that is the project I will be working on... won't he be surprised when he returns?!? I'm also hoping to have the cardigan done, or nearly done by the time he gets back. The cardigan, the popcorn afghan, and the commissioned projects will definitely keep me busy mindlessly for when I need a diversion from my mind wandering to places that it best not wander off to.
Nicole =o)
Wednesday, April 2
What the hell?!?
No, this isn't a late April Fool's joke... it's really me!!! I know it's been a long hiatus, even for me, but it's good to be back. One of the main reasons I haven't been around is because I had lost my internet access for 2 months. It was quite difficult surviving without any contact with my friends at all since I'm so isolated out here! Oh well... what's past is past! Let's get on with some progress info! I want to get this posted, so pics will have to follow... there are a few pictures in my Flickr though, as well as all of the project info in my Ravelry notebook.
These are the projects I can remember finishing since I was last on Blogger:
Lissa's garter rib scarf is done! Even with the couple of errors in the pattern, it worked out well. I've heard through the grapvine that many of the patterns in Magknits have problems with errors that are never fixed. I find this disenheartening since one of the patterns in my Ravelry queue is a cool looking pair of socks from there.
Rebecca's snake scarf is done. I remember having a few difficulties with this pattern as well, and was quite disappointed since I had just gotten over the troubles with Lissa's scarf. Overall I'm very pleased with how it turned out.
Derek's work socks are also finally complete! This is the same pair that I cast on right after finishing Henry's back in October. They were put on the backburner while I worked on winter items, and were finally picked back up and finished in late March. I won't be starting any new work socks for him for a little while. Only working on these socks during breaks at my jobs made this a *very* long project to complete.
My blue stole was finished over this last weekend. When I went to update my sidebars, I realized that I hadn't even added it!!! I started this shawl well over 2 years ago... before Camille's had even closed! Derek and I were at Michael's, and he helped me choose the pattern as well as the yarn. I had cast it on, and had gotten about one ball into the project when I put it aside. The last time I can recall working on it prior to the last little while was when I was in Thompson 2 years ago this June!
I've got two new projects on the needles currently:
My Step socks. I'm making myself a pair of generic stockinette socks out of a ball of Austermann Step that I bought last year in Calgary. When I first started them on 2.0 mm dpns, I found the yarn to be horribly splitty. I restarted them on 2.25s with much better results. I did have to increase my usual number of cast on stitches, but the sock is still working up fast. As of this writing, I am just coming up on the heel flap and turn.
My Mystic Ocean shawl. I have finally started the Mystic Waters KAL shawl. This KAL was actually held in the fall, but I had neither the time, nor the supplies to do it then. When we took a recent trip to Winnipeg, I picked up some Estelle Watercolours and an Addi Lace needle to complete this shawl. The colourway I chose screamed "Green Ocean" to me, so it was the perfect choice for my project. As of this writing I'm nearly complete the second of eight charts... Row 95-ish of about 350-ish.
With the weather warming up outside, I have been able to knit during my coffee breaks at both jobs, not just lunch breaks, so that really helped in getting Derek's socks done, as well as the amazing progress on my Step socks already. My shawl is my computer/ living room project, and is going quite well even though I'm left with a halo of mohair fuzz all over my clothes every time I work on it! Even though I have Alex's hoodie listed as a WIP on my sidebar, it's currently actually a UFO. I need to find the pattern yet again!!! I'm finding that concentrating on just one project at home, and one travelling project is currently the best use of my knitting time.
These are the projects I can remember finishing since I was last on Blogger:
Lissa's garter rib scarf is done! Even with the couple of errors in the pattern, it worked out well. I've heard through the grapvine that many of the patterns in Magknits have problems with errors that are never fixed. I find this disenheartening since one of the patterns in my Ravelry queue is a cool looking pair of socks from there.
Rebecca's snake scarf is done. I remember having a few difficulties with this pattern as well, and was quite disappointed since I had just gotten over the troubles with Lissa's scarf. Overall I'm very pleased with how it turned out.
Derek's work socks are also finally complete! This is the same pair that I cast on right after finishing Henry's back in October. They were put on the backburner while I worked on winter items, and were finally picked back up and finished in late March. I won't be starting any new work socks for him for a little while. Only working on these socks during breaks at my jobs made this a *very* long project to complete.
My blue stole was finished over this last weekend. When I went to update my sidebars, I realized that I hadn't even added it!!! I started this shawl well over 2 years ago... before Camille's had even closed! Derek and I were at Michael's, and he helped me choose the pattern as well as the yarn. I had cast it on, and had gotten about one ball into the project when I put it aside. The last time I can recall working on it prior to the last little while was when I was in Thompson 2 years ago this June!
I've got two new projects on the needles currently:
My Step socks. I'm making myself a pair of generic stockinette socks out of a ball of Austermann Step that I bought last year in Calgary. When I first started them on 2.0 mm dpns, I found the yarn to be horribly splitty. I restarted them on 2.25s with much better results. I did have to increase my usual number of cast on stitches, but the sock is still working up fast. As of this writing, I am just coming up on the heel flap and turn.
My Mystic Ocean shawl. I have finally started the Mystic Waters KAL shawl. This KAL was actually held in the fall, but I had neither the time, nor the supplies to do it then. When we took a recent trip to Winnipeg, I picked up some Estelle Watercolours and an Addi Lace needle to complete this shawl. The colourway I chose screamed "Green Ocean" to me, so it was the perfect choice for my project. As of this writing I'm nearly complete the second of eight charts... Row 95-ish of about 350-ish.
With the weather warming up outside, I have been able to knit during my coffee breaks at both jobs, not just lunch breaks, so that really helped in getting Derek's socks done, as well as the amazing progress on my Step socks already. My shawl is my computer/ living room project, and is going quite well even though I'm left with a halo of mohair fuzz all over my clothes every time I work on it! Even though I have Alex's hoodie listed as a WIP on my sidebar, it's currently actually a UFO. I need to find the pattern yet again!!! I'm finding that concentrating on just one project at home, and one travelling project is currently the best use of my knitting time.
Thursday, November 15
I'm at 20!!! Holy Crap!!!
Well it's official... I've hit the 20 pair mark for this year! That makes my average a little under 2 pairs a month, which is nothing to be ashamed of, unless you include the fact that my sock yarn stash doesn't seem to be getting any smaller!!! That's another 420 metres added to my total, which is now at 6087 metres... I'VE BROKEN THE 6 KM MARK!!!
On Tuesday afternoon I did the final stitches on the "Boss Wife Socks". These are the socks that I knit for the wife of Derek's boss Henry... whose socks were the last sock FO featured here. They've really been wonderful in everything they've done for us since {and even before} we moved out here, and it's just a small token of how much I {we} appreciate it. Clicking on the picture will take you to the Flickr page for it, or you can visit my main Flickr page to see all of my photos. If you want more details on these socks, leave me a comment, or go visit the project page on Ravelry. Of course you can view all my projects on my main projects page on Rav too!
On Tuesday afternoon I did the final stitches on the "Boss Wife Socks". These are the socks that I knit for the wife of Derek's boss Henry... whose socks were the last sock FO featured here. They've really been wonderful in everything they've done for us since {and even before} we moved out here, and it's just a small token of how much I {we} appreciate it. Clicking on the picture will take you to the Flickr page for it, or you can visit my main Flickr page to see all of my photos. If you want more details on these socks, leave me a comment, or go visit the project page on Ravelry. Of course you can view all my projects on my main projects page on Rav too!
Thursday, November 8
Less than three days!
Well, it *was* 5 calendar days, but it was 95% done in less than 2, and the other 3 days *were* working days, so they don't really count! I would guesstimate it took me about 15-20 hours of crocheting time from start to finish on this project... with well over an hour spent on the last round alone!
What *did* I accomplish?
Other than teaching my kids a few new curse words that were directed at my craptastic ISP over the last few days, I did manage a few productive things as well!
I got the table topper blocked and photographed... the pictures will follow in a day or so.
I made a between-projects dishcloth... part of my 10 dishcloths challenge.
I got nearly 2 full 2-pattern repeats done on the snowdrop shawl... status pic to follow in a day or so.
I got the heel flap, heel turn, and gusset picked up on the Tofu socks.
I got the ribbing done on Sheri's sock so that it's now a mindless knitting project.
I got 3 repeats of my sock design pattern done.
I frogged a cardigan I'd started for Lissa, and got the yarn balled up.
I frogged a pullover for Alex and restarted it in the round.
I cleaned out the inside of my computer and partially set it up in my craft room.
I located more of the "Lissa stash", and 2 different camo yarns for projects to work on while I teach knitting to a co-worker.
I still haven't decided what I'll be working on as my 3 projects... I will probably have to make it either 4 or 5, since I'll have 2 different ones going at work. Stay tuned!
I got the table topper blocked and photographed... the pictures will follow in a day or so.
I made a between-projects dishcloth... part of my 10 dishcloths challenge.
I got nearly 2 full 2-pattern repeats done on the snowdrop shawl... status pic to follow in a day or so.
I got the heel flap, heel turn, and gusset picked up on the Tofu socks.
I got the ribbing done on Sheri's sock so that it's now a mindless knitting project.
I got 3 repeats of my sock design pattern done.
I frogged a cardigan I'd started for Lissa, and got the yarn balled up.
I frogged a pullover for Alex and restarted it in the round.
I cleaned out the inside of my computer and partially set it up in my craft room.
I located more of the "Lissa stash", and 2 different camo yarns for projects to work on while I teach knitting to a co-worker.
I still haven't decided what I'll be working on as my 3 projects... I will probably have to make it either 4 or 5, since I'll have 2 different ones going at work. Stay tuned!
Monday, November 5
It's done, done, done!!!
Yes!!! The three-day table topper is officially finished! I did the last few stitches on it when I got home from work this morning, wove in the ends, and washed it. As soon as I'm done this post, I'll be blocking it out and then going to bed. I'll get pictures of it up tomorrow probably. I won't be making a matching one after all... we don't carry the DMC Traditions at this store... that makes *that* decision a little easier!!!
Derek went digging in the store yesterday and found all kinds of goodies for me! I now have the power cord to one of my sewing machines, so I can finally get started on a bit of that! He also found a bag with a few balls of sock yarn in it... why wasn't that in my sock yarn bin? In any case, that's giving me the motivation to finally post some more of my stash on Ravelry.
I've started the heel turn on my Tofu socks, but I don't know what I want to work on here at home now that the table topper is finished. I joined a group that has you pledge to work on only three projects at a time. Well the Tofu is one, and I can't decide on the other two since I've got about seven different projects in front of me here at the computer, all in differing stages of completion.
Here are the choices:
Derek went digging in the store yesterday and found all kinds of goodies for me! I now have the power cord to one of my sewing machines, so I can finally get started on a bit of that! He also found a bag with a few balls of sock yarn in it... why wasn't that in my sock yarn bin? In any case, that's giving me the motivation to finally post some more of my stash on Ravelry.
I've started the heel turn on my Tofu socks, but I don't know what I want to work on here at home now that the table topper is finished. I joined a group that has you pledge to work on only three projects at a time. Well the Tofu is one, and I can't decide on the other two since I've got about seven different projects in front of me here at the computer, all in differing stages of completion.
Here are the choices:
- Lissa's cardigan - nearly done
- Lace shawl - barely started
- Blue shawl - about 25%
- Sheri's socks - just started sock #2
- New sock design - about 4" knit of sock #1
- Derek's socks - just started sock #1
- Ripple ghan - 25%-ish
What do you think my choices for #2, and #3 should be? Leave me a comment and let me know!
Monday, October 29
Nineteen and counting!!!
Well, it's official now... I've finished my nineteenth pair of socks this year. The "Boss" Work Socks are done. I'll be taking pictures the morning and posting them then, but I just had to brag now!!! I've cast on another pair of work socks of course! This pair is an oatmeal pair with green stripes for Derek. Until I get my initial order from Briggs & Little for the store, I only have one more pair's worth of Tuffy left in my stash. I *finally* started my paperwork for becoming a retailer, so hopefully that will all be getting off the ground very soon. I also cast on a pair using the yarn that Derek bought for me when he was in Winnipeg last month. This pair will be one of the new designs I'm hoping to feature at the store when I get it back online.
Thursday, October 18
A shawl is born!!!
I'm waiting until there's good light to take a picture, but I had to announce that Princess Lissa has a completed shawl at long last! I finished it off this afternoon, and will be fighting to get a higher resolution photo of the completed shawl up in the next day or so. It ended up being about 32" from tip to tip across the neck, 22" from middle back to the point, and 42" from tip to point on either side. It *is* a bit big for her tiny body, but she should get a couple of years wear out of it before it's too small to be useful.
Subscribe to:
Posts (Atom)